News
BVIEC technical staff will not lose their jobs – Henry O. Creque
POCKWOOD POND, Tortola, VI – Technical staff of the British Virgin Islands Electricity Corporation (BVIEC) slept comfortably last night as it was publicly announced yesterday September 15, 2016 that they will not lose their jobs to Wartsila’s arrangement with the local power company.
BVIEC to move engines out of Long Bush next year
POCKWOOD POND, Tortola, VI - Residents and businesses in Long Bush and surrounding areas can look forward to a more quiet environment come 2017 as the British Virgins Islands Electricity Cooperation (BVIEC) is expected to transfer the engines that are in that location to Pockwood Pond.
‘Light at the end of the tunnel’- Leroy A. E. Abraham
PORT PURCELL, Tortola, VI – The British Virgin Islands Electricity Corporation (BVIEC) has begun to offloaded its three Wartsila power generating sets for the Phase V Power Development Project, which is geared towards tackling the power woes hitting the territory.
Three new generators arrive for BVIEC’s Phase V Project
ROAD TOWN, Tortola, VI- With the frequent power outages being experienced in the territory due to load shedding and other issues, residents would welcome the news that three new engines have arrived for the BVI Electricity Corporation’s (BVIEC) Phase V Power Development Project, although they are not expected to be added to the grid until in December.
BVIEC investigating 'root' cause of island-wide power outage
ROAD TOWN, Tortola, VI- Sometime around 1:00 A.M. on June 27, 2016 there was an island wide power outage that the BVI Electricity Corporation (BVIEC) is now investigating.